Special Assessments

2017-2 SSL to Fargo

Due to the growth of the City of Horace, the existing Lagoons are reaching capacity and would have to be expanded to receive any major additional flow. The project construed a sanitary sewer force main and associated lift stations connecting to the City of Fargo at Deer Creek.

  • Map Included
  • City Driven

2017-5 8th Avenue Truck Route

The purpose of the project is to construct an extension of 8th Avenue from Nelson Drive to 4th Street East. This extension would be used as a designated truck route rather than Park Drive.

  • Map Included
  • City Driven

2017-7 Drainage|Chip Seal (Maple Circle, Maple Lane)

The purpose of the project is to remove the existing asphalt valley gutters and replace them with concrete valley gutters, cleanout the drainage swales, clean out an existing pond, and seal coat the pavement.

  • Map Included
  • City Driven

2017-8 Mill|Overlay (Northwood Dr | Southwood Dr)

The purpose of the project is milling and overlaying the existing bituminous pavement, removing and replacing signage and water system gate valves.

  • Map Included
  • City Driven

2018-1 Sewer to 100th Ave Area

This project provides sanitary sewer service to the 100th Avenue area South of Horace proper. This project consists of a sanitary sewer lift station and force-main to the City of Horace.

  • Map Included
  • Currently in planning phase
  • Requested by a Developer

2018-2 Sewer to 64th Ave

This project provides sanitary sewer service to the 64th Avenue area of Horace. This project consists of gravity sanitary sewer mains, force mains, and a sanitary sewer lift station.

  • Map Included
  • Currently in planning phase
  • Requested by Property Owner

2018-3 Terra Gardens

Terra Gardens is a residential subdivision with a total anticipated +188 living units.

2019-1 Lakeview Drive

The proposed project constructs Lakeview Drive and 79th Avenue including infrastructure such as: Streets, shared use path, sanitary and storm sewer, street lights. This project is being proposed in anticipation of the new West Fargo Middle and High School construction starting in 2019.

2019-2 76th & Roundabout

The proposed project is being constructed because of the new West Fargo Middle and High School in Horace. The project consists of a concrete street, shared use path, storm sewer, street lighting and a 1 ½ roundabout at the intersection of Cass County 17 and 76th Avenue.

  • Map Included

2019-3 81st Ave & 63rd St

The proposed project is being constructed due to the new West Fargo Middle and High School.

2019-4 Visto Industrial 3rd Addition

Visto Industrial is a commercial subdivision.

Assessment Process